FY 2008 ANNUAL PLAN OF WORK

 

Back Creek TOTAL MAXIMUM DAILY LOAD Implementation Plan

This project is designed to address water quality problems in the Back Creek Watershed and in rural watersheds

with livestock production.  Water quality problems (fecal bacteria and sediment) in Back Creek Watershed will be

addressed through obtaining stakeholder input on innovative Best Management Practices, developing a Total

Maximum Daily Load Implementation Plan, implementing and evaluating innovative Best Management Practices,

and securing additional funds to support continued implementation in the watershed.  Monitoring will be

performed in Hutton Creek to evaluate the effects of Best Management Practices already established there and to

estimate the impact of implementing more traditional Best Management Practices.

__________________________________________________________________________________

ACTION                                               COST                           COUNCIL                               STAFF

PLANNED                                           ESTIMATE:                 REPRESENTATIVE:             REPRESENTATIVE

2008:                         2009:                                                                                                         & TIME ___________________________________________________________________________________________

Implement      | Complete      | $133,630                    | Joseph Gorman                    | Gary Boring   120 hours

 

bacterial source tracking analysis for total maximum daily  loads 2007-2008

The RC&D Council joined in a collaborative effort with MapTech, Inc. and the Virginia Department of

Environmental Quality to support Virginia’s efforts to develop Bacterial Total Maximum Daily Load Studies.

This project will conduct a bacterial source tracking analysis on samples collected from impaired waters.  The

project will provide an analysis for 1,200 samples over a two-year period for 60 free flowing surface water

stations and 60 shellfish water stations.

___________________________________________________________________________________

ACTION                                               COST                           COUNCIL                               STAFF

PLANNED                                           ESTIMATE:                 REPRESENTATIVE:             REPRESENTATIVE

2008:                         2009:                                                                                                         & TIME   ___________________________________________________________________________________________

Complete        |                      | $218,546                      | C. P. Shorter                        | Gary Boring    20 hours

                                                                                                                                      Becky Smith   20 hours

     

JAMES RIVER TOTAL MAXIMUM DAILY LOAD STUDY

The VA Department of Environmental Quality identified 40 segments of the James River as impaired with

regards to fecal coliform bacteria, dissolved oxygen or pH.  The Total Maximum Daily Load Study establishes the

allowable loadings or other quantifiable parameters for a water body and thereby provides the basis for the

commonwealth to establish water quality based controls.  These controls should provide the pollution reduction

necessary for a water body to meet water quality standards.

___________________________________________________________________________________

ACTION                                               COST                           COUNCIL                             STAFF

PLANNED                                           ESTIMATE:                REPRESENTATIVE:           REPRESENTATIVE

2008:                         2009:                                                                                                       & TIME   ___________________________________________________________________________________________

Complete      |                      | $652,791                    | M. Jay Hubble                 | Gary Boring   20 hours

     

COMMUNITY FIRE PROTECTION PROGRAM 2005

This project will implement mechanical fuel reduction activities on 265 acres protecting approximately 200

homes across Virginia.  This state-wide fuel reduction project will be targeted to high risk communities and

individual homes located within 3 miles of U.S. Forest Service land.  The project will improve the safety of 200

homes and serve as demonstration sites across Virginia.  This project will enhance the educational campaign to

promote the Firewise Virginia campaign as a means of promoting additional hazard mitigation projects

throughout identified hazard communities.  Virginia’s citizens, landowners, planners and community leaders will

be made more aware of the need for pre-planning as well as the benefits of hazard mitigation activities.  Wildfire

and property damage risks will be significantly reduced and communities will be made safer through cooperative

efforts.

___________________________________________________________________________________

ACTION                                               COST                           COUNCIL                              STAFF

PLANNED                                           ESTIMATE:                 REPRESENTATIVE:            REPRESENTATIVE

2008:                         2009:                                                                                                         & TIME   ___________________________________________________________________________________________

Complete       |                       | $200,000                    | Louis Brossy                      | David Richert   60 hours

                                                                                                                                  Gary Boring     16 hours